Use this page to select the criteria for running the Zero-out Data process.
Contents
Field | Description |
Criteria
|
Use this field to select one of the following options:
- Total Project
- Control Account
- Work Package
- WBS
- OBS
- WP
- Resource Assignment
|
Selection
|
This field is available only if you select a criterion other than
Total Project in the
Criteria field. Click
to display the dialog box that lists all valid options based on the selected criterion. For example, if you select
Control Account in the
Criteria field, the Control Account lookup dialog box displays, showing all control accounts used in the selected project.
|
Include all children
|
Selecting this option selects all of the child nodes of the code you select in the
Selection field. This option is available only if you select
WBS or
OBS in the
Criteria field.
|